WARNI NG
Make all electrical and coax connections from the controller to the mount
and LNB's BEFORE applying power to, or connecting the satellite
receiver to the controller.
Note: When the controller is turned OFF it continues to pass voltage from the receiver to
the LNB if the receiver remains connected to 110 AC power. Shorting the coax at any time
during installation may cause damage to either the Controller or the DiSEqC Switch (if
installed). Failure to follow this procedure can result in voiding of warranty replacement,
not to mention time spent trying to troubleshoot a system that does not perform.
REMEMBER
90% of all problems are a result of incorrect CONNECTIVITY or
CONFIGURATION.
Comentarios a estos manuales